Electrical and instrumentation works

AMEM have acquired know-how, experience and capabilities to perform electrical and instrumentation installation works to suit the best Client satisfaction.

The first of such contracts was awarded in 1991 for the EAI installation works at the balance of plant (BOP) for EGAT Nam Phong Combined Cycle power station unit I and II. The contract was on an EPC basis.
Since then we were able to offer competent solutions to all Customers in Thailand.

The first contract for EAI works in the Arabian Gulf was awarded to us in 2008 for the five (5) HRSG supplied by Nooter Eriksen to Qatar Water Electricity Company, Ras Abu Fontas – Qatar – Phase B2 and A1.

We have then proceeded along this path offering same services to Keppel Seghers at Domestic Solid Waste Management Centre located in Mesaieed, Qatar and then in Doha North Sewage Treatment Plant in Umm A1 Sala for Ashghal.

Below an excerpt of the activities performed by our team:

  • Detail engineering for cableways routing with related bill of materials needed for the procurement of the cable ways, cables and accessories.
  • HV/LV, fibre optical, grounding cable laying and terminations.
  • M.C.C. panels, switchgears assembly and installation.
  • Transformers and Bus Duct erection.
  • DCS, PLC, Telecommunication, PA and CCTV systems installation.
  • Instruments calibration.
  • Continuity checks and test.
  • Loop checks.
  • Pre-commissioning activities.
  • Commissioning Activities.
  • Operation and Maintenance

It is worthwhile to mention that in order to carry out the above services, it is mandatory to possess a Grade 1 st – Unlimited License issued by Kahramaa. We have received such a license since 2008.

In UAE since 2010, AMEM is a pre-qualified EAI Contractor in all major ADNOC Group of Companies.